Survey, Investigation, Design, Supply, Erection, Testing and commissioning of Lift Irrigation Scheme for filling up of Indargi and other 27 Tanks by lifting water from Tungabhadra River in Gangavathi Taluka, Koppal district comprising of following components: Construction of Jackwell cum pump house, Vertical turbine pumps coupled to HT motors Electrical panel, soft starter, capacitors, Power transformers, 33/6.6 KV substation, 33 KV power line, and 33 KV Terminal bay, Rising main, Pressure Distribution network through MS/HDPE pipes with installation of surge protection system, supply of spares and tools including operation and maintenance for five years after successful commissioning of the entire system on turnkey basis.
Survey, Investigation, Design, Supply, Erection, Testing and commissioning of Lift Irrigation Scheme for filling up of Indargi and other 27 Tanks by lifting water from Tungabhadra River in Gangavathi Taluka, Koppal district comprising of following components: Construction of Jackwell cum pump house, Vertical turbine pumps coupled to HT motors Electrical panel, soft starter, capacitors, Power transformers, 33/6.6 KV substation, 33 KV power line, and 33 KV Terminal bay, Rising main, Pressure Distribution network through MS/HDPE pipes with installation of surge protection system, supply of spares and tools including operation and maintenance for five years after successful commissioning of the entire system on turnkey basis.
Survey, Investigation, Design, Supply, Erection, Testing and Commissioning of Pipe Distribution Network comprising of Bleeders (3,4,5,6 &10), Gravity network, field Irrigation pipe Network from the 20 Ha outlet to each individual farm of 1 Ha, including construction of all Crossing Structures to provide Irrigation facility to 3535.0 Ha of left out command area above Bilagi Branch Canal & South Branch Canal of GLBC and including filling of water for 2-tanksand Improvements to 7 tanks in Bilagi & Mudhol taluks, Bagalkot District, complete with Supply of Spare Parts, Tools including Operation and Maintainence of the System for five years from the date of completion on Turn Key Basis under Melligeri Halagali Lift irrigation scheme Phase-2 (Indent No: KNNL/2024-25/LI/WORK_INDENT1340)