Lump-sum Turnkey basis for the work “Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal, Jack well cum pump house, Vertical Turbine pumps coupled to HT Motors, Pump house Electrical works, Necessary valves, Delivery Pipe, Manifold system, Power supply including terminal bay, 110 KV Electrical Sub Station, Transmission line, Raising Main and Delivery Chamber) for providing irrigation facility to 8390 Ha of command area in Chikkodi taluk, Belagavi District by lifting water from Krishna River near Kallol Village during Kharif season including Operation and Maintenance for a period of 5 years after successful completion of work KARAGAON LIFT IRRIGATION SCHEME
Construction of Bridge cum Barrageacross Tungabhadra River near Chikkamanchale Village, Raichur Taluk and District and Improvement & Widening of Approach Roads for Both Sides.
Survey, Investigation, Design, Supply, Erection, Testing and commissioning of Lift Irrigation Scheme for filling up of Indargi and other 27 Tanks by lifting water from Tungabhadra River in Gangavathi Taluka, Koppal district comprising of following components: Construction of Jackwell cum pump house, Vertical turbine pumps coupled to HT motors Electrical panel, soft starter, capacitors, Power transformers, 33/6.6 KV substation, 33 KV power line, and 33 KV Terminal bay, Rising main, Pressure Distribution network through MS/HDPE pipes with installation of surge protection system, supply of spares and tools including operation and maintenance for five years after successful commissioning of the entire system on turnkey basis.