"Comprehensive Environmental (EIA & EMP) Studies and preparation of “Environment & Ecology” Chapter of Revised DPR for the Hirong HE Project (351 MW) till grant of Environmental Clearance (EC) (excluding the application for TOR and grant of TOR)".
NORTH EASTERN ELECTRIC POWER CORPORATION LTD (NEEPCO Ltd.)
DESIGN, ENGINEERING,MANUFACTURE, ASSEMBLY, TESTING, INSPECTION, SUPPLY AND TRANSPORTATION OF 8 NOS. OF NEW LHB TYPE RAILWAY TREASURY VANS WITH ACCESSORIES ETC.
Design, Engineering, Manufacture, Testing, Packing & forwarding, delivery at site stores, Loading & Unloading, Supply, Dismantling of the existing system, Erection, Testing & Commissioning of DCS based Supervisory Control and Data Acquisition (SCADA) system and Field Instruments for complete Power House, Common auxiliaries equipment and Switchyard of Upper Sileru Power House (USPH–4X 60 MW) and Supply, Erection, Testing & Commissioning of Vibration Monitoring System for USPH.
Global Tender through TBCB mode (followed by e-Reverse Auction) is invited for 900 MW/ 5400 MWh Rampura Pumped Storage Project in Tonk, Rajasthan, under the Build-Own-Operate- Transfer (BOOT) model.