"CONSTRUCTION OF PAVILION AT SAIPUM PLAYGROUND, SAIPUM, KOLASIB,MIZORAM UNDER PHASE-I CSR SCHEMES FOR THE FY 2026-27 IN RESPECT OFTHPS, NEEPC LTD, MIZORAM".
NORTH EASTERN ELECTRIC POWER CORPORATION LTD (NEEPCO Ltd.)
Development, Operation and Maintenance of a Manufactured Sand and Aggregate Processing Plant at Tubed Coal Mines Area on Build Own Operate (BOO) Mode.”
Dr.NTTPS – Stage-III – R&M of Through-Flow Travelling Water Screen (TWS) Machines for Cooling Water (CW) Pump House for Units 5 & 6 (2x210 MW) of Stage-III at Dr.NTTPS