Dr.MVR RTPP – “Outsourcing of Services for the “Up-Keeping & Regular Maintenance works pertaining to Stage-I & Stage-II Circles of Dr.MVR RTPP” for a period of Two (02) Years i.e. i.e. for the period from 01.04.2024 (or) from the actual date of commencement of work to 31.03.2026 etc.
Outsourcing of Services for Operation, Maintenance and up- keeping works pertains to A&MM, Stage-I, Stage-II, Stage-III, Stage-IV, Stage-V & CHP Circles of Dr.NTTPS, Dr.Narla Tatarao Thermal Power Station (Dr.NTTPS)
"Supply of 5.0 lakh Metric Tonnes (3.0 Lakh Metric Tonnes for Dr. NTTPS and 2.0 Lakh Metric Tonnes for Dr.M.V.R RTPP) of Imported Non coking (Steam) coal on FOR destination basis to Dr. NTTPS & Dr.M.V.R RTPP Thermal Power Plants, Andhra Pradesh, India."
"Transportation of 80.0 Lakh MT (40.0 Lakh MT per Annum) of Raw coal from M/s. Mahanadi coalfields Ltd, Talcher or Washed coal from M/s. ACB (India) Limited washery siding (SSMT)/ any other washery sidings at M/s.MCL, Talcher or part quantity of both raw coal & washed coal to Rayalaseema Thermal Power Project (RTPP), AP on “FOR” destination basis by Rail cum Sea cum Rail (RSR) route via Paradip and Adani Krishnapatnam /Ennore ports for a period of Two years."