Design, Engineering, Manufacturing, testing at manufacturer’s works before dispatch, Supply, transportation, storage at site, intra site transportation, insurance (transit, storage cum erection testing & commissioning),erection, testing and commissioning of 9 nos. Vertical Francis Reversible Pump-Turbines and synchronous Motor-Generator set ETC.
"Dr.NTTPS – CHP - Manual unloading of coal from wagons at Road no.4 with Proclainers and transportation of coal from yard near Road no.4 to Stage-IV stock yard through Lorries (0-1KM) for feeding to Unit-8 (800MW)/Stage-V/Dr.NTTPS from the date of commencement of work to 31.03.2024 or completion of quantities whichever is later"
" Supervision of loading of coal into Railway wagons, linkage materialization, liaisoning with Railways and mines for proper movement of coal, shortage minimization, witnessing of weighment of coal, witnessing the sample collection & preparation and proper receipt at destination for the coal supplied from loading points of M/s. Singareni Collieries Company Ltd., to Dr. NTTPS and RTPP of APGENCO "
Transportation of 60 lakh MT (30 lakh MT per annum) of Raw coal from M/s. Mahanadi coalfields Ltd, Talcher or Washed coal from M/s. ACB (India) Limited washery siding (SSMT)/any other washery sidings at M/s.MCL, Talcher or part quantity of both raw coal & washed coal to Dr.NTTPS on “FOR” destination basis by Rail cum Sea cum Rail (RSR) route via Paradip and Kakinada ports for a period of Two years".