Lifting of raw coal from M/s.MCL Mines, transporting the same upto APGENCO washery at Talcher, washed coal from washery siding to Dr. NTTPS, Vijayawada or any other Power Plant of APGENCO and disposal of washery rejects for a period of Three years
Design, Engineering, Supply, Erection & Commissioning of Grid Connected Rooftop Solar PV Plants including Comprehensive Operation & Maintenance (O&M) for 5 Years Period in DVC owned Buildings within DVC Command Area in the state of West Bengal & Jharkhand. .
" Promotional (Regional) Exploration (G2) of coal in Kesurli block, Wardha Valley Coalfield, in Yavatmal District in the State of Maharashtra, India ".
Lump-sum Turnkey basis for the work “Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal, Jack well cum pump house, Vertical Turbine pumps coupled to HT Motors, Pump house Electrical works, Necessary valves, Delivery Pipe, Manifold system, Power supply including terminal bay, 110 KV Electrical Sub Station, Transmission line, Raising Main and Delivery Chamber) for providing irrigation facility to 8390 Ha of command area in Chikkodi taluk, Belagavi District by lifting water from Krishna River near Kallol Village during Kharif season including Operation and Maintenance for a period of 5 years after successful completion of work KARAGAON LIFT IRRIGATION SCHEME