OPERATIONALIZING 06 NOs. WEIGHBRIDGEs OF JCI ON ‘AS IS WHERE IS’ BASIS (AFTER NECESSARY REPAIRING, MAINTENANCE etc. ) AND THEREBY OPERATING INITIALLY FOR A PERIOD OF 03 (THREE) YEARS.
Deep Ocean Simulator (DOS) – 1500 bar as per specification as per Technical specifications, Structural drawings attached in the special condition of the contract (SCC) .