Global Invitation for Bids (GIFB) for Pre Bid Tie up for STATCOM Package ST-07T for (a) ± 1x300 MVAr STATCOM with 2x125 MVAr MSC, 1x125 MVAr MSR at 765/400/220kV Bikaner-IV S/s in 400kV Bus Section-1; (b) ± 1x300 MVAr STATCOM with 2x125 MVAr MSC, 1x125 MVAr MSR at 765/400/220kV Bikaner-IV S/s in 400kV Bus Section-2 associated with “Transmission system for evacuation of power from Rajasthan REZ Ph-IV (Part 3: 6GW) [Bikaner Complex]: Part A” through Tariff Based Competitive Bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC. Spec No: CC/T/W-STAT/DOM/A10/24/10580
Supply, Installation & Maintenance of IT/Cloud infrastructure of Data Centre at Manesar for Establishment of Pilot Data Centre at POWERGRID Manesar by PowerTel. Spec. No. CC/NT/W-IT/DOM/A06/24/08843"
Corrigendum No.-I to NIT/IFB in ITJ for Pre-Bid Tie up for STATCOM Package - ST06T associated with ‘Network Expansion scheme in Gujarat for drawl of about 3.6 GW load under Phase-I in Jamnagar area’ through Tariff Based Competitive Bidding (TBCB) route prior to RfP bid submission by POWERGRID to BPC” Spec. No: CC/T/W-STAT/DOM/A04/24/02009.
VH2B: Material Science Lab – 2B - EBSD and EDS System for SEM for Establishment of Research & Development (R&D) Centre at POWERGRID GIS Complex, Manesar, Gurgaon. Specification No. CC/NT/W-MISC/DOM/A00/23/12398"
VH2A: Material Science Lab – 2A - Scanning Electron Microscope (SEM) (for metallurgical, microstructure analysis) for Establishment of Research & Development (R&D) Centre at POWERGRID GIS Complex, Manesar, Gurgaon
VH2A: Material Science Lab – 2A - Scanning Electron Microscope (SEM) (for metallurgical, microstructure analysis) for Establishment of Research & Development (R&D) Centre
Supply, installation, and commissioning of EDS and EBSD for Scanning Electron Microscope for Establishment of Research & Development (R&D) Centre at POWERGRID GIS Complex, Manesar, Gurgaon
INVITATION FOR BIDS for TOWER PACKAGE – TL01, TL02, SS01, SS02 & SS03 UNDER TRANSMISSION LINE & SUBSTATION WORKS ASSOCIATED WITH TRANSMISSION PROJECT IN KENYA THROUGH PPP-JV MODEL WITH AFRICA50