ANWAL LIFT IRRIGATION SCHEME Stage 2- Providing of Raising Main pipe (Design,supply, erection, testing and commissioning) including allied works such as anchor blocks, thrust blocks, structures for crossings, necessary valves, surge protection works, railway crossing and delivery chamber at Ch:148+800of Ghataprabha Right Bank Canal in Badamitaluk of Bagalkote district including OperationandMaintenance for a period of 5 years after successful completion of work ANWAL LIFT IRRIGATION SCHEME Stage-2 on Turn-Key Basis." (Indent No. KNNLI2024-25/LIWORK_INDENT1122)
Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal, Jack well cum pump house, Vertical Turbine pumps coupled to HT Motors, Power supply including terminal bay, 110 KV Electrical Sub Station, Transmission line, Rising Main and Delivery Chamber) for providing irrigation facility to 8390 Ha of command area in Chikodi taluka of Belagavi District by lifting water from Krishna River near Kallol village during Kharif season including Operation and Maintenance for a period of 5 years after successful completion of work KARAGAON LIFT IRRIGATION SCHEME on Turn-Key Basis” (PHASE-1 works).
"ANWAL LIFT IRRIGATION SCHEME Stage 2- Providing of Raising Main pipe (Design,supply, erection, testing and commissioning) including allied works such as anchor blocks, thrust blocks, structures for crossings, necessary valves, surge protection works, railway crossing and delivery chamber at Ch:148+800of Ghataprabha Right Bank Canal in Badamitaluk of Bagalkote district including OperationandMaintenance for a period of 5 years after successful completion of work ANWAL LIFT IRRIGATION SCHEME Stage-2 on Turn-Key Basis."
“Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal, Jack well cum pump house, Vertical Turbine Pumps coupled to HT Motors, Pump house Electrical works, Necessary valves, Delivery Pipe, Manifold system, Power supply including 110 KV /33 KV transformer bay, terminal bay, 33 KV Electrical Sub Station, Transmission line, Raising Main, Pressure Distribution) for filling up of Basappa tank in Gunjalli Village & other tanks of Raichur taluk by lifting water from Tungabhadra River near Chikkamanchale village including Operation and Maintenance for a period of 5 years after successful completion of work for GUNJALLI(BASAPPA) TANK FILLING SCHEMEon Turn-Key Basis.” 584
Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal, Jack well cum pump house, Vertical Turbine Pumps coupled to HT Motors, Pump house Electrical works, Necessary valves
Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal,