Optimization of Workspace and Installation of Centralized Air Conditioning, Fire Water Sprinkler System and Building Management System in all the Floors of DVC Towers Kolkat
Proposal for Setting up of Grid Tied Floating Solar PV (FSPV) Plant of capacity 10 MW (AC) in the raw water reservoirs of DVC Chandrapura Thermal Power Station (CTPS), Chandrapura, Jharkhand including 05 (Five) years O&M period of the Solar PV Plant.
verification and health checking of Bently-Nevada make Turbine differential expansion, Axial Shift and VMS system Of Turbine Shaft and Bearing Vibration, Generator Shaft and Bearing Vibration and all HT drives Bearing Vibration, Keyphasors including CW pump Bearing Vibration,Keyphasors along with software related problem of whole system including vibration monitoring System Server/ computer of the unit of CTPS U#8 by M/S GE Oil & Gas India Private Limited, The OEM during the AOH of unit #8. .
Routine earth work for maintenance of rising and distribution mains up to 300 mm dia C I & D.I. & GI pipe lines including maintenance of valves etc. upto 300 mm dia at CTPS colony, DVC, Chandrapura