Annual Manning and Operation on round the clock basis for 05(five) nos. Panel Operated Cabins, 06(Six) nos. Level Crossing Gates (existing), 04(four) nos. of additional new Level Crossing Gates after complete construction, 01(one) no. Central Railway Control Room and round the clock manning for OHE isolator operation work in the Captive Railway Network of Mejia Thermal Power Station, DVC.
Hiring of one TATA Winger or equivalent AC Ambulance (Diesel driven, high roof & hard top cover) prevailing present Pollution norms i. e. BS-VI for RTPS Mini Hospital, RTPS, DVC. Round the clock (i. e. 24 x7 hrs)