Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal, Jack well cum pump house, Vertical Turbine pumps coupled to HT Motors, Power supply including terminal bay, 110 KV Electrical Sub Station, Transmission line, Rising Main and Delivery Chamber) for providing irrigation facility to 8390 Ha of command area in Chikodi taluka of Belagavi District by lifting water from Krishna River near Kallol village during Kharif season including Operation and Maintenance for a period of 5 years after successful completion of work KARAGAON LIFT IRRIGATION SCHEME on Turn-Key Basis” (PHASE-1 works).
Operation of Cafeteria for selling of food items as per pre-determined menu and rate in the premises of NEEPCO Limited, Shillong, on yearly License basis”.
“Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal, Jack well cum pump house, Vertical Turbine pumps coupled to HT Motors, Power supply including terminal bay, 110 KV Electrical Sub Station, Transmission line, Rising Main and Delivery Chamber) for providing irrigation facility to 8390 Ha of command area in Chikodi taluka of Belagavi District by lifting water from Krishna River near Kallol village during Kharif season including Operation and Maintenance for a period of 5 years after successful completion of work KARAGAON LIFT IRRIGATION SCHEME on Turn-Key Basis” (PHASE-1 works).
"Outright purchase/ ‘Lease for 28 Years’ of Land up to 800 Acres with all requisite statutory clearances inclusive of chain link fencing around the periphery of the Land & obtaining connectivity with STU for setting up Solar Power Project(s) upto 200 MW capacity in the State of Punjab".
Setting up of State of the Art Plug and Play Co-Working Spaces situated on ground floor at Junta House, Panaji-Goa (Civil, Interiors, Furniture, HVAC, Electrical and Allied Works).” "Renovation/Interior Works for Goa Staff Selection Commission of office premises in Block No.601,602,603 and 604 at 6th floor Spaces Building Patto, Plaza, Panaji Goa.”
Balance of System Package Including Power Evacuation and Three (03) Years Comprehensive Operation & Maintenance for Cumulative Capacity of 400 MW (AC) (MSEDCL Phase VII & IX) Solar Photovoltaic Power Project(s) at Four Different Locations in Maharashtra