Lump-sum Turnkey basis for the work “Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal, Jack well cum pump house, Vertical Turbine pumps coupled to HT Motors, Pump house Electrical works, Necessary valves, Delivery Pipe, Manifold system, Power supply including terminal bay, 110 KV Electrical Sub Station, Transmission line, Raising Main and Delivery Chamber) for providing irrigation facility to 8390 Ha of command area in Chikkodi taluk, Belagavi District by lifting water from Krishna River near Kallol Village during Kharif season including Operation and Maintenance for a period of 5 years after successful completion of work KARAGAON LIFT IRRIGATION SCHEME
Supply, Installation, Integration and commissioning of remote systems for Coastal Ocean surface current and wave measurements along the Indian coast for ICORN
City Cleaning Project: collection and Transportation of Solid Waste, Street Sweeping Waste (including street sweeping activities), Horiculture Waste and Collection and Storage of Domestic Hazardous Waste in Zone 5 and 6 (Package 6) to the Designated Processing Facility / Dumpsite / Depositing centers of Greater Chennai Corporation.
Construction of Bridge cum Barrageacross Tungabhadra River near Chikkamanchale Village, Raichur Taluk and District and Improvement & Widening of Approach Roads for Both Sides.