Design, Engineering, Manufacturing, testing at manufacturer’s works before dispatch, Supply, transportation, storage at site, intra site transportation, insurance (transit, storage cum erection testing & commissioning),erection, testing and commissioning of 9 nos. Vertical Francis Reversible Pump-Turbines and synchronous Motor-Generator set ETC.
Re-routing of Power cable of 6.6KV Board Incomer # 2 of Combined Ash Slurry System from CAB# III to 6.6KV PHRB situated at BTPS `B¿ CW Pp House building for enabling dismantling of BTPS `B¿ U# 1,2 & 3