Installation of FGD system at CTPS U#7&8(2X250 MW)” as per the Scope mentioned in VOLUME-II of this EOI documents following the terms & conditions of this EOI documents
BCCL
Issue Date:02-11-2022
Closing Date:30-11-2022
Location:Kolkata, West Bengal
ITJ Volume:
ITJ Volume No:
ITJ Publication Date:
16-11-2022
Description:Installation of FGD system at CTPS U#7&8(2X250 MW)” as per
the Scope mentioned in VOLUME-II of this EOI documents following the terms & conditions of
this EOI documents