Supply of Hydrogen Gas cooler assembly(complete) suitable for 210MW,15.75KV,Turbo Generator, Type THW-210-2(LMW machine) with buy back pertaining to Stage-I, Dr.NTTPS.
ANDHRA PRADESH POWER GENERATION CORPORATION LTD
Issue Date:11-09-2026
Closing Date:28-09-2026
Location:Vijayawada, Andhra Pradesh
ITJ Volume:
ITJ Volume No:
ITJ Publication Date:
16-09-2026
Description:Supply of Hydrogen Gas cooler assembly(complete) suitable for 210MW,15.75KV,Turbo Generator, Type THW-210-2(LMW machine) with buy back pertaining to Stage-I, Dr.NTTPS.